Sale 3

Project: House Refusbishment & Remodel
Location: Sale
Cost: £300k tbc

Associate Architect: Jules Karczewski
Contractor: tbc
Structural Engineer: tbc 

Site Programme: tbc
Service: RIBA Plan of Work Stage 0 – 7
Project Status: Householder Planning Permission granted February 2022

Description: The project brief is to for the most part internally refurbish and remodel this long-time family home in Sale and to future-proof it for the long-term needs to an extended family.

Submission has been prepared by Atoll and backed-up with a 2D CAD drawings of both existing and proposed. Current works are ongoing with Building Regulations and thereafter detailed design tender documents.

Categories: Architecture

Leave a Reply